Tennessee Department of Transportation : Pickering Firm
 

Tennessee Department of Transportation

I-269 (S.R. 385) Poplar Ave. to Macon Road) | Collierville and Piperton, Tennessee

Services
  • Survey
  • Roadway Design
  • Interchange Design
  • Hydraulic Design
  • Culvert Design
  • Permit Sketches
  • Erosion Control
  • Traffic Control
  • Pavement Markings and Signage
  • Signal Design
  • ADA Improvements

This project included new alignment of approximately eight miles of I-269 in Shelby and Fayette Counties, the final segment to complete the outer loop around Memphis. The project included grade separation improvements to several side roads along the corridor with interchanges at S.R. 57 and S.R. 193 and accounted for a future interchange to accommodate the planned extension of Walnut Grove Road.

The new alignment crossed the Wolf River, necessitating a substantially long bridge to satisfy the environmental requirements. An earthen berm was constructed adjacent to a neighborhood for noise abatement. Close coordination with several stakeholders including Spring Hill Golf Course, Memphis Light, Gas and Water, and the TDOT Structures Division ensured a seamless project.

Blog

View More

Twitter Feed

Corporate Headquarters

6363 Poplar Avenue, Suite 300
Memphis, TN 38119

(901) 726-0810 or (800) 844-0810

(901) 272-6911

pickering@pickeringfirm.com

  • US Green Building Council
  • Energy Star
  • GSA
© 2024 Pickering Firm, Inc. All Rights Reserved.