Electrolux Grand Opening

Back to Blog
Jan 10, 2014
Pickering Firm
On Thursday, January 9th, Electrolux held its Grand Opening in Memphis! Located in the Frank C. Pidgeon Industrial Park, the new Electrolux manufacturing plant makes Memphis home of a World Class manufacturing facility. As part of the Albert Kahn project team, Pickering provided civil engineering/site development. The 217-acre site, located behind the Mississippi River levee, required extensive soil remediation and borrow fill. Pickering also provided field surveys and roadway design for the widening of Paul Lowry Road, adjacent to the Electrolux facility. Read about the Grand Opening here , here.

LEAVE A COMMENT

Blog Latest Topics
View More

Blog

View More

Twitter Feed

Corporate Headquarters

6363 Poplar Avenue, Suite 300
Memphis, TN 38119

(901) 726-0810 or (800) 844-0810

(901) 272-6911

pickering@pickeringfirm.com

© 2024 Pickering Firm, Inc. All Rights Reserved.